← All Commercial projects

Dental fit-out · Haverhill CB9

Dental surgery fit-out with navy worktops

An empty consulting room converted into a full working surgery — new opening formed, services run in, and fitted out with navy seamless worktops.

Dental surgery fit-out with navy seamless worktops, white cabinetry and dental chair, Haverhill CB9
Completed surgery seen from the door: dental chair, navy worktop run and matching wall units, Haverhill CB9
Dental chair and delivery unit with the corridor beyond, Haverhill CB9
Navy worktop and inset basin with the chair and window to the right, Haverhill CB9
Chair, light and delivery unit with the navy cabinetry behind, Haverhill CB9
Navy wall unit above the worktop run and drawer units, Haverhill CB9
Surgery with chair, operating light and radiator below the window, Haverhill CB9
New opening cut through the wall to connect the rooms, Haverhill CB9
Room stripped out with floor lifted and services run along the wall, Haverhill CB9
Bare room with first-fix services in and floor ready for levelling, Haverhill CB9

The brief

The Haverhill CB9 practice was expanding into an adjoining room that had never been used clinically — no services, no access from the practice side, and a floor that had already been lifted.

The work

We formed a new structural opening through to the existing practice, then ran drainage, water, suction and electrical first fix under the floor to the new chair position. Walls and ceiling were made good, new lighting installed, and a wrap-around run of cabinetry fitted with navy seamless worktops, an integrated basin and a wall-mounted autoclave cupboard. The floor was finished in welded safety vinyl with coved skirtings.

The result

A third surgery that matches the rest of the practice exactly, with the new opening finished so it reads as though it was always there.

Have a similar project in mind?

Get in touch for a free, no-obligation quote. We'll get back to you as soon as possible.